Electric VW Bus project

Built by Millersville Students, Powered by Millersville Energy

Skip to content
  • Home
  • Build / Media – Follow the Bus Build
  • How to get involved
  • The Calendar of Events
  • The Team (Growing)
  • Tools/Supplies/Help Needed
← Last Gas Day – At the SMC
Ready for Sandblasting →

Gas Engine is GONE

Posted on 2015/10/25 by

Video of VW bus running…. last day as a gas vehicle

This entry was posted in The Story of the Build. Bookmark the permalink.
← Last Gas Day – At the SMC
Ready for Sandblasting →

Comments are closed.

  • Recent Posts

    • Getting Ready for Battery install
    • People Power move the Bus
    • Getting out of workshop with .225 inches to spare
    • See what the media is saying.
    • Our New welder is tested by a NEW welder
  • Recent Comments

    • Archives

      • April 2016
      • March 2016
      • December 2015
      • November 2015
      • October 2015
      • September 2015
      • August 2015
    • Categories

      • The Story of the Build
    • Meta

      • Log in
      • Entries feed
      • Comments feed
      • WordPress.org
    Millersville University
    Powered by WordPress
    Skip to toolbar
    • Blogs @ MU
    • Log In