Phil and Emily attended open lab on Wednesday, October 5th to find a way to secure the drip system.  Tyler could not make open lab due to classes.  We discovered that strings could be used to keep the drip system up right and centered.  The working system can be seen in the picture below.

We did not have class Monday, October 10th due to fall break.

Wednesday, October 12th we discussed what still needed to be done and worked on odds and ends.  The system is completely built so we did not need to go into the lab at all.  We planned on spray painting the bucket black but the rain stopped us so Tyler will be doing it at home.  The system was put together to reference in updating the bill of materials and taking measurements for the computer drawing.  We looked at a timer to use but discovered we will need a different one with a 3 prong outlet.