Category Archives: General

***** Electrical Load Reduction Announcement *****

Facilities Management Department **** ALERT ***** Electrical Load Reduction Announcement ***** ALERT ***** Description:   Constellation Energy, our electrical grid operator, has mandated a reduction of our electrical consumption.  This initiative avoids brown-outs and black-outs throughout the Pennsylvania, New Jersey, … Continue reading

Posted in General | Tagged | Leave a comment

Capital Construction and Maintenance Projects: SMC Book Store Entrance Blocked

Capital Construction and Maintenance Projects SMC North Entrance Lobby Partial Closure Description: Several areas above the ceiling of SMC’s north entrance lobby (near the Book Store) will be insulated. Construction Timeframe: Beginning date:   September 7, 2013   7:00 a.m.  Ending date:        September 7, 2013   … Continue reading

Posted in Faculty, General, Staff, Students | Tagged , , | Leave a comment

Street Sign Installation

Capital Construction and Maintenance Projects Street Sign Installation Description: Several signs will be installed throughout campus to provide better directions for students, staff, faculty and visitors.  Construction Timeframe: Beginning date:   September 3, 2013   7:00 a.m.  Ending date:        September 4, 2013   5:00 p.m. Campus … Continue reading

Posted in Faculty, General, Staff, Students | Tagged | Leave a comment

Capital Construction and Maintenance Projects Residence Hall Replacement Project – Phase I – Road Closures

Description: Construction for Phase I of the Residence Hall Replacement Project is underway.  For safety and coordination issues, Centennial Drive will be closed this year and reopen prior to the fall 2014 semester.   Please note, Centennial Drive and East Residence … Continue reading

Posted in Faculty, General, Staff, Students | Tagged , | Leave a comment

Capital Construction and Maintenance Projects: Boyer Parking Lot and Brooks Drive Changes

Capital Construction and Maintenance Projects Boyer Parking Lot Changes Description:  The Frederick Street exit from Boyer Parking Lot is now open for the Fall 2013 semester.  Brooks Drive has also returned to two-way traffic.   Construction Timeframe: Beginning date:   August 19, 2013 … Continue reading

Posted in Faculty, General, Staff, Students | Tagged , , | Leave a comment

Interior Renovation in the Cove at Lyle Hall

Description: Interior renovations will be done to the Cove in Lyle Hall. Construction Timeframe: Beginning date:   July 29, 2013       6:00 a.m.  Ending date:        August 2, 2013     5:00 p.m. Campus Impact:  The Cove will be closed, including access to the MAC machine.  … Continue reading

Posted in General | Tagged , , , | Leave a comment