Monthly Archives: September 2013

***** Electrical Load Reduction Announcement *****

Facilities Management Department **** ALERT ***** Electrical Load Reduction Announcement ***** ALERT ***** Description:   Constellation Energy, our electrical grid operator, has mandated a reduction of our electrical consumption.  This initiative avoids brown-outs and black-outs throughout the Pennsylvania, New Jersey, … Continue reading

Posted in General | Tagged | Leave a comment

Capital Construction and Maintenance Projects: SMC Book Store Entrance Blocked

Capital Construction and Maintenance Projects SMC North Entrance Lobby Partial Closure Description: Several areas above the ceiling of SMC’s north entrance lobby (near the Book Store) will be insulated. Construction Timeframe: Beginning date:   September 7, 2013   7:00 a.m.  Ending date:        September 7, 2013   … Continue reading

Posted in Faculty, General, Staff, Students | Tagged , , | Leave a comment

Street Sign Installation

Capital Construction and Maintenance Projects Street Sign Installation Description: Several signs will be installed throughout campus to provide better directions for students, staff, faculty and visitors.  Construction Timeframe: Beginning date:   September 3, 2013   7:00 a.m.  Ending date:        September 4, 2013   5:00 p.m. Campus … Continue reading

Posted in Faculty, General, Staff, Students | Tagged | Leave a comment